Battle Mountain Solar Farm Clean Energy

Battle Mountain Solar Farm

Client Consolidated Edison, Inc.
Completion Date June 2021
Location Battle Mountain, Nevada
Completed by ͵ÅÄ×ÔÅÄ Energy Services, Inc.

͵ÅÄ×ÔÅÄ Energy was the prime contractor for the engineer-procure-construct (EPC) delivery of this 132-MWdc photovoltaic (PV) plant, which features 100MWh/25MWdc of battery energy storage for a four-hour period. The facility’s 25 megawatts of battery capacity make it among the nation’s largest DC-coupled combined solar and battery storage system. Part of NV Energy’s Integrated Resource Plan, Battle Mountain will bring 1,001 MW of new renewable energy projects to Nevada.

Per the scope, ͵ÅÄ×ÔÅÄ Energy procured the trackers, inverters, battery energy storage system (BESS), and balance of system (BOS); installed the piling, tracker, AC/DC cable, wire, and module; and conducted commissioning and testing.